Installation requirements for sewage treatment equipment

Jun 20, 2026

Leave a message

1. Based on the installation and foundation drawings of the underground sewage treatment equipment, prepare the foundation according to the dimensions shown in the installation plan. Construct a concrete base slab with an average bearing capacity of 5t/m². The foundation must be level and installation should only proceed after the concrete foundation has cured. If the equipment is installed below ground level, the foundation's relative elevation to the ground level should be as shown in the drawings. The excavation around the perimeter must be at least 500mm from the foundation edge to facilitate pipe installation.

2. Pipe installation and connections should be planned during equipment placement. During placement, the equipment's weight must be considered in accordance with the instructions, and the crane's tonnage must be appropriate. The installation sequence should follow the site reference drawings. The position and orientation of the cylinders must be correct, and the spacing between pipes must be accurate.

3. Connect the pipes according to the installation drawings. After the equipment is in place, secure the pipe connections with rubber gaskets to prevent leaks.

4. After the underground sewage treatment equipment is installed, the equipment must be firmly connected to the foundation floor to ensure that it does not float. Sewage must be injected into the equipment (if no sewage is available, use other water sources or tap water) to fill it to at least 70% capacity to prevent it from floating. Also, check all pipes for leaks. Test all pipe openings to ensure there are no leaks, and that the equipment is not affected by rising ground water levels, which could cause misalignment or tilting.

1

5. After the equipment installation is complete and without problems, fill the area around the equipment and the gaps with soil, compact it, and level the ground. When filling, pay attention to the following:

(1) The manhole cover must be approximately 50mm above the ground level;

(2) Do not allow soil to block the air inlet on the manhole cover.

 

6. Connect the control lines of the electrical control cabinet to the equipment. When wiring, pay attention to the rotation direction of the underwater aerator and submersible pump motors. If the control cabinet is in a basement, place it in a well-ventilated and dry area. Generally, the control cabinet should not be placed outdoors. Protect it from sunlight and rain. To prevent leakage and damage to the control board and wiring terminals.

 

7. Precautions for buried sewage treatment equipment:

(1) The installation site must be designed to prevent water accumulation during rain;

(2) The outlet pipe of the equipment must be at least 0.4m below the ground level;

(3) No heavy objects should be placed on top of the equipment, and large vehicles should not pass over it (unless otherwise specified);

(4) The equipment should generally not be emptied of its internal sewage to prevent groundwater from causing it to float.

 

8. Note that the installation diagram and pipe connection diagram of this equipment should be connected and laid out according to standard specifications. If the user requests a different layout, it can be arranged arbitrarily, but this must be specified in the contract.

 

9. Connect the control lines of the blower and water pump, and ensure that the rotation direction of the blower and water pump is correct.